- CN2 industrial cluster is on the route which connects provincial road 131; National Highway 3, 18; Highway 05 (Noi Bai – Lao Cai); Highway 07 (Noi Bai – Thai Nguyen); Highway 09 (Noi Bai – Bac Ninh – Ha Long).
- Around 5 minutes far from Noi Bai international airport.
- 30 km from Hanoi center.
- About 120 km from Hai Phong port, moving by highway QL5 and highway QL5B, maximum speed 120km/h.
- About 30km to Samsung Thai Nguyen, 23 km to Samsung Bac Ninh (around 30 minutes by car).
- Belong to Soc Son Urban Zoning Planning area 4:
– The expected population on the scale of 561.31 hectares in 2030 is 21,150 people;
– Create a multi-industry concentrated industrial area. In particular, priority is given to the development of electronics industry – information technology, mechanical engineering, automobile manufacturing, new materials industry, medicinal chemistry – cosmetics, textiles and garments… At the same time, invest in construction of public utility, infrastructure, worker housing and auxiliary works serving industrial parks.
National Highway 2A
(Vo Van Kiet Road)
Provincial Road 131
Merge lanes Highway 05
(Noi Bai – Lao Cai)
Merge lanes National Highway 18 and Vo Nguyen Giap Road
Merge lanes National Highway 18 and Vo Nguyen Giap Road
Road surround CN2
(*) According to Decision No. 8705/QĐ-UBND dated December 10, 2024 of the People’s Committee of Soc Son district on approving the Master Plan Adjustment Project at scale 1/500 of CN2 industrial cluster, Mai Dinh commune, Soc Son district.
(Applicable at land plots for industrial construction, production support works and warehouses )
– Minimum area: 2,000 m2/lot;
– Maximum construction density: 70%;
– Minimum green area: 20%;
– Separate wastewater treatment station, ensuring column B standards (production wastewater: QCTDDHN 02:2014/BTNMT; domestic wastewater: QCVN 14:2018/BTNMT) before entering the centralized wastewater treatment station of Industrial cluster (output wastewater reaches column A-QCTĐHN 02:2014/BTNMT);
Electricity supply: The project is supplied by Noi Bai 110kv electrical substation located at the city’s South West; Total capacity is around 18.000 kVA.
Bank
Water supply: The project is supplied by No.2 Ha Noi Joint Stock Company (capacity of 22.000m3/d) and from the city water resource along highway number 3. Industrial zone also providing pressure pump (capacity of 2022 m3/d).
Rental office and parking lot
Sewage system: The project has a wasted water treatment plant with the capacity of 1.250 m3/d-n, meeting A level standard.
Product exhibition space
Internet & tele communication: The information communication system meets international standards, connected and ready at the land lots.
Utility services serving managers, experts, and workers working in the Industrial Cluster